The Water and Power Development Authority (WAPDA) has devised a plan to increase the existing 9,406 megawatts (MW) to 20,591 MW by the year 2028-29.
Source link
The Water and Power Development Authority (WAPDA) has devised a plan to increase the existing 9,406 megawatts (MW) to 20,591 MW by the year 2028-29.
Source link