The sources said the CPWD have given the reasons behind the expected rise in the cost which include higher cost of steel as building is now constructed as per the norms of seismic zone 5.
Source link
The sources said the CPWD have given the reasons behind the expected rise in the cost which include higher cost of steel as building is now constructed as per the norms of seismic zone 5.
Source link